web analytics cheap Stainless Steel Pipe - Project Management Network - Project Management | Forums | Communications Management
PMnetwork Subscription|1|
Go to Page
  First Page  Previous Page    21  22  23  [24]  25  26   Next Page  Last Page
Author Previous Topic Topic Next Topic  
fish51a
Newbie


11 Posts
Posted -  2/24/2020  :  3:13:30 AM
The product brief introduction of large diameter stainless tubing
The connection modes of stainless steel pipes are various. The common types of pipe fittings are compression, compression, flexible, propulsion, threaded, socket welding, flexible flange connection, welding and derivative series of connection modes combining welding with traditional connection. These connection modes, according to their different principles, their scope of application is also different, but most of them are easy to install, solid and reliable.
Product Characterization
large diameter stainless tubing 
Stainless steel is a production which not easy rust,acid resistance and corrosion resistance, so it is widely used in light industry,heavy industry,daily necessities and the decoration industry. My company long-term supply stainless steel products, including stainless steel pipes,stainless steel flagpole, stainless steel street light pole and stainless steel lightning rods.
Product Photograph
What is the packaging of products?
1. Each piece in a plastic bag and than put in the fibre bag.
2. seaworthy packing.
3. According to the customer’s request.
Trade Information
Trade TermsFOB, CIF, EXW, etc
MOQ1 piece
PortGuangzhou port/Shenzhen port, China
ShipmentBy sea, by express or by air
Payment TermsT/T, L/C at sight, Western Union
Payment condition40% before production, 60% before delivery
Sample AvailabilityYes
Sample Time2   to 3 working days
Delivery time7-15 days, depend on the quantity of products
ServiceOEM, ODM, or Customized
Why choose us?
1. One-stop Solution: Offer from design, machining/fabrication, welding, surface treatment to finally assembly.
2. Quality Guarantee: Experience engineer, precision machines, CMM and closed-loop QC system to ensure quality.
3. Customer Service: Every customer is served by a specialized sales for timely technical support and after-sales service.
FAQ
1. Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
2. What advantages do we have?
A: 1) Strength: Our own factory and professional sales team.
2) Experience: More than 10 years manufacturing experience.
3) Price: Competitive.
4) Service: Professional before & after sales service.
5) 100% inspection.
3. What is your quotation element?
A: Drawing or Sample, Material, finish and Quantity.
4.  How long should we take for a quotation?
A: After receiving detail information we will quote within 2 days.
Quality Assurancecheap Stainless Steel Pipe
website:http://www.jqfflagstaff.com/stainless-steel-pipe/ 


Edited by - fish51a on 2/24/2020


Replies
Author
Go to Page
  First Page  Previous Page    21  22  23  [24]  25  26   Next Page  Last Page
 
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:36:36 AM
DAXX



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:37:38 AM
bala



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:38:39 AM
Gene



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:39:41 AM
Elec



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:40:43 AM
Stev



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:41:44 AM
Wind



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:42:46 AM
fift



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:43:48 AM
Fier



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:44:49 AM
Texa



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:45:51 AM
Chic



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:46:53 AM
Brad



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:47:54 AM
Jenn



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:48:56 AM
Dura



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:49:57 AM
Chai



Go to Top of Page
wickiup
Master Programmer


187461 Posts
Posted - 4/13/2022 : 2:50:59 AM
Pion



Go to Top of Page
Topic is 59 Pages Long:
Go to Page
  First Page  Previous Page    21  22  23  [24]  25  26   Next Page  Last Page
 




Database Error!
-2147467259 | Cannot open database ''. It may not be a database that your application recognizes, or the file may be corrupt.

INSERT INTO PORTAL_ONLINE (UserID,UserIP,DateCreated,CheckedIn,LastChecked,M_BROWSE,UserAgent) VALUES ('Guest','3.148.112.15','20240529062325','20240529062325','20240529062325','Viewing Message
cheap Stainless Steel Pipe','Mozilla/5.0')